Steel rail for Ring Road 3 and Rach Mieu 2
Two bridge-rail packages share one method: takeoff from the drawings, repeat fabrication, delivery by span.

Ring Road 3 rail in Ho Chi Minh City and Rach Mieu 2 bridge rail between Tien Giang and Ben Tre both sit in the traffic-equipment line.
The shop cuts, brakes, welds, and finishes to the tolerance in the set. Repeat lengths stay on the same fixtures so the first piece and the last piece match.
Deliveries go to site with a quantity check for each batch.

